PROJECTS & PLANS > In Development
Monte Christo Wind Interconnection

Monte Cristo Windpower, LLC. has requested to interconnect their 236.9 MW wind generating facility called “TexasAg”; to the ETT transmission system along ETTs North Edinburg to Pomelo 345kV transmission line at a new 345kV substation to be owned by ETT called Brisita. ETT will construct the Brisita station as a three-breaker 345kV ring bus expandable to a breaker and a half configuration with an RTU and EPS metering.